Lake Manager’s Report – June 2022
1. As part of the on-going repairs to the Wonder Lake Dam spillway, the MPOA structural engineer conducted an examination to determine the location and extent of needed concrete repairs on the vertical sidewalls. Temporarya scaffolding was installed to allow for this inspection, as well as to facilitate the actual repair work. Coordination is now taking place between the concrete contractor and the project structural engineer on the type of concrete material to be used for the spillway wingwall patching.